Concrete broken up to allow for new drains and inspection chamber. Spalled bricked removed and replaced, DPC fitted.
Brickwork at the back of the house pointed in, minor repairs to spalled bricks done and DPC fitted at repaired areas.
Concrete and brick garage foundation removed and pit filled in.
Brickwork under window repointed.
Brickwork above window repaired with Helibar & Cementitious Grout.
New joist fitted to support floor at chimney breast.
Woodworm damaged studs removed and replaced.
New stud wall frame constructed.
Opening between shower room and understairs blocked up.
Smaller door frame fitted to shower room.
Poor brickwork under window replaced, DPC fitted.
Double doors removed, single door frame fitted.
New electric meter fitted.
First fix wiring done.
Another skip filled.
Catnic lintel fitted to front bedroom, replacing damaged wooden one.
New lintel fitted to patio doors opening.
Fireplace opened up.