Gallery Image

 
DSC03952.JPG
 

October Progress



DSC03544.JPG

Concrete broken up to allow for new drains and inspection chamber. Spalled bricked removed and replaced, DPC fitted.

DSC03543.JPG

Brickwork at the back of the house pointed in, minor repairs to spalled bricks done and DPC fitted at repaired areas.

DSC03542.JPG

Concrete and brick garage foundation removed and pit filled in.

DSC03541.JPG

Brickwork under window repointed.

DSC03540.JPG

Brickwork above window repaired with Helibar & Cementitious Grout.

DSC03539.JPG

New joist fitted to support floor at chimney breast.

DSC03538.JPG

Woodworm damaged studs removed and replaced.

DSC03537.JPG

New stud wall frame constructed.

DSC03536.JPG

Opening between shower room and understairs blocked up.

DSC03535.JPG

Smaller door frame fitted to shower room.

DSC03534.JPG

Poor brickwork under window replaced, DPC fitted.

DSC03533.JPG

Double doors removed, single door frame fitted.

DSC03532.JPG

New electric meter fitted.

DSC03529.JPG

First fix wiring done.

DSC03528.JPG

Another skip filled.

DSC03549.JPG

Catnic lintel fitted to front bedroom, replacing damaged wooden one.

DSC03547.JPG

New lintel fitted to patio doors opening.

DSC03545.JPG

Fireplace opened up.

Leave a Reply