Progress 19-07-2012

Hall:

Removed radiator. Removed plasterboard behind front door. Chipped away original lime behind front door. Re-located meter board to allow plaster removal. Tidied up electrics to avoid loose cables. Removed all rubble to main pile.

Living Room:

Revoved plasterboard from TV alcove. Removed remainder of brick arch. Cut back TV arial cables. Removed all rubble [...]

Progress 18-07-2012

Kitchen:

Removed center island. Located second water main and isolated. Removed excess pipework.

Hall:

Added 16Amp RCBO protected circuitĀ  on a temporay consumer unit. Linked downstairs lighting circuit to a 3Amp plug.

Shower Room:

Removed cracked toilet cistren. Capped cold water supply to toilet. Switched on water.

Living Room:

Removed right brick arch. Removed TV [...]

Progress 17-07-2012

General:

Compleated purcahse and obtained keys.

Kitchen:

Removed cupboards and sink.

Shower Room:

Capped off water supply to boiler. Tested water to shower room, too many leaks to leave connected for now.

Living Room:

Removed bar. Removed left brick arch.